{"id":1012,"date":"2021-07-09T00:25:05","date_gmt":"2021-07-09T00:25:05","guid":{"rendered":"http:\/\/reports.cityofsandy.com\/planning\/?p=1012"},"modified":"2021-07-09T00:25:05","modified_gmt":"2021-07-09T00:25:05","slug":"development-services-monthly-report-june-2021","status":"publish","type":"post","link":"https:\/\/reports.cityofsandy.com\/planning\/2021\/07\/09\/development-services-monthly-report-june-2021\/","title":{"rendered":"Development Services \u2013 Monthly Report \u2013 June 2021"},"content":{"rendered":"\n<p><strong>2<sup>nd<\/sup> Quarter Report 2021 \u2013 available lots in subdivisions<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"698\" src=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021-1024x698.png\" alt=\"\" class=\"wp-image-1013\" srcset=\"https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021-1024x698.png 1024w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021-300x204.png 300w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021-768x524.png 768w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021-440x300.png 440w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Tentative-platted-lots-report-Q2-2021.png 1156w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<p>Attached is an&nbsp;updated&nbsp;platted&nbsp;and tentative&nbsp;platted&nbsp;lots&nbsp;list through June 30, 2021. &nbsp;We issued 16 single family homes between April and June. &nbsp;With substantial completion occurring at Shaylee Meadows the number of house permits issued will increase this fiscal year. &nbsp;We issued 8 house permits for Shaylee Meadows in June and are currently reviewing 6 additional house permits. &nbsp;Lennar plans to submit 2 new house permits each week for review.&nbsp;<\/p>\n\n\n\n<p>Jewelberry Meadows (20 lots) and Jewelberry Ridge (9 lots) are both completing&nbsp;tree&nbsp;removal and grading work. &nbsp;With the approval of Cedar Creek Heights (89 lots) and Ten Eyck Rim (9 lots), we will see additional subdivision&nbsp;construction for those two subdivisions soon. &nbsp;Jacoby Heights (32 lots) has expired and therefore was removed&nbsp;from the report. &nbsp;Planning staff is also reviewing the subdivisions known as Deer Meadows (formerly Bull Run Terrace), Sandy Woods Phase II, and The Bornstedt Views. &nbsp;Deer Meadows was deemed complete and will be reviewed at the September 27, 2021 Planning Commission meeting. &nbsp;Sandy Woods Phase II and The Bornstedt Views are both being reviewed for completeness.<\/p>\n\n\n\n<p>You will receive the next\u00a0update\u00a0in October 2021.<br><\/p>\n\n\n\n<p><strong>Planning Department items:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"499\" src=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-1024x499.jpg\" alt=\"\" class=\"wp-image-1014\" srcset=\"https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-1024x499.jpg 1024w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-300x146.jpg 300w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-768x374.jpg 768w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-1536x749.jpg 1536w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-2048x998.jpg 2048w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Space-Age-July-2021-500x244.jpg 500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption>Space Age station &#8211; open for business!<\/figcaption><\/figure>\n\n\n\n<p>Space Age fueling station (19-012 DR):&nbsp; &nbsp;This station now has a certificate of occupancy and is fully operational.<\/p>\n\n\n\n<p>Repeal of SMC Chapter 17.64 Planned Development (21-034 DCA):&nbsp; This action has been scheduled for a July 26<sup>th<\/sup> Planning Commission meeting.<\/p>\n\n\n\n<p>Olson St. Hardship Permit (21-020): This type III application is for a permit for a hardship trailer at a residence on Olson Street. &nbsp;This application is scheduled to be heard at the Planning Commission meeting on July 26<sup>th<\/sup>. &nbsp;Staff is currently finishing up the staff report and slides for that meeting.<\/p>\n\n\n\n<p>37685 Olson St. Annexation (21-027): This type IV application for a property owner looking to annex his property into the city has been deemed complete. &nbsp;This application is scheduled to be heard at the Planning Commission meeting in August.&nbsp;<\/p>\n\n\n\n<p>38487 Maple Street (21-028 TREE):&nbsp; This request to remove a retention tree in the Marshall Ridge subdivision has been deemed complete and is currently under review.<\/p>\n\n\n\n<p>Bornstedt Views&nbsp;Subdivision (21-021 SUB\/TREE):&nbsp; The application for this 42 lot subdivision between Bornstedt Rd and Averill Parkway south of Cascadia Village has been deemed incomplete \u2013 waiting on additional materials from applicant.<\/p>\n\n\n\n<p>39555 Stefenee Court (21-031 DR):&nbsp; This request to build a new single family residence has been deemed incomplete; currently waiting on additional information from applicant.<\/p>\n\n\n\n<p>39221 Pleasant&nbsp;St (21-026 MP):&nbsp; This minor replat in downtown Sandy has now been deemed complete by staff and is currently under review.<\/p>\n\n\n\n<p>Sandy Woods Phase 2 (21-037 SUB\/VAR\/TREE):&nbsp; This application for a 43 lot subdivision south of Kelso Road is currently being checked for completeness.<\/p>\n\n\n\n<p>Fred Meyer EV charger station (21-038 DR):&nbsp; This application for additional charging stations in the Fred Meyer parking lot is currently being checked for completeness.<\/p>\n\n\n\n<p>Rogue Fabrication design review (21-039 DR): &nbsp;Staff just received this application from the applicant recently and is currently reviewing it for completeness.<\/p>\n\n\n\n<p>Downtown Walkability Assessment:&nbsp; A decision was made recently to incorporate this assessment into the Transportation System Plan.&nbsp; Look for the DWA to be included in the TSP that comes before PC\/Council later in the year.<\/p>\n\n\n\n<p>City of Sandy Comprehensive Plan Update:&nbsp; Staff has completed the RFQ and posted it on the City\u2019s website and a few industry publications.&nbsp; Plan also sent directly to a couple of specialty firms.&nbsp; Proposal deadline is August 6<sup>th<\/sup>; contractor selection deadline is August 18<sup>th<\/sup>.<\/p>\n\n\n\n<p>City of Sandy Parks Master Plan Adoption:&nbsp; ESA is in the process of making final edits to the plan prior to staff running this master plan through the land use application process.<\/p>\n\n\n\n<p>Bull Run Electric Building:\u00a0 Exterior shell of building mostly complete.\u00a0 Working on utilities and interior spaces and anticipating an August 1<sup>st<\/sup> completion\/occupation date for the leasable spaces.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"484\" src=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-1024x484.jpg\" alt=\"\" class=\"wp-image-1015\" srcset=\"https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-1024x484.jpg 1024w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-300x142.jpg 300w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-768x363.jpg 768w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-1536x726.jpg 1536w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-2048x968.jpg 2048w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BRE-Building-July-2021-500x236.jpg 500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption>BRE Building &#8211; leasable spaces available in August<\/figcaption><\/figure>\n\n\n\n<p>Ten Eyck Rim Subdivision (21-015 SUB\/TREE):&nbsp; The final order for this application for a 9 lot subdivision along Ten Eyck between Pleasant and Hood was issued on June 15<sup>th<\/sup>.<\/p>\n\n\n\n<p>Wells Fargo lighting upgrades (21-007 DR):&nbsp; Still waiting on additional information from applicant after application was deemed incomplete by staff in April.<\/p>\n\n\n\n<p><s><u><br><\/u><\/s><strong><s><br><\/s><\/strong><strong>Kelly\u2019s Kudos:<br><br><\/strong>Nothing this month.<\/p>\n\n\n\n<p><em><strong><s><br><\/s><\/strong><\/em><em><strong>Internal projects<\/strong><\/em><strong>:&nbsp; <\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Community Center Porte Cochere project (20-002 FAC):\u00a0 The architectural and engineering work for this project is now complete, and the bid period is officially open.\u00a0 An <a href=\"https:\/\/www.ci.sandy.or.us\/development-services\/page\/invitation-bid-sandy-community-center\">Invitation to Bid<\/a> is currently posted for this project on the City\u2019s website \u2013 there will be an optional pre-bid conference at the construction site on July 14<sup>th<\/sup> to answer any questions about the project, and the bid closing date\/time is 2:00 PM on July 28<sup>th<\/sup>.\u00a0 We are hoping to see construction start in August and be completed by the end of 2021.<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-1024x576.jpg\" alt=\"\" class=\"wp-image-1017\" srcset=\"https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-1024x576.jpg 1024w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-300x169.jpg 300w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-768x432.jpg 768w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-1536x864.jpg 1536w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-2048x1152.jpg 2048w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/Le-Happy-CS-July-2021-500x281.jpg 500w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption>Le Happy covered structure &#8211; now open to the public!<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Permanent Outdoor Covered Structures grant program:\u00a0 This program was given a status review at the June Ec Dev Committee meeting \u2013 here is the status of the program as of the beginning of July 2021:<br><ul><li>Ria\u2019s\/SFR \u2013 Construction is complete! Structure is currently being used by applicant.<\/li><\/ul><ul><li>Le Happy \u2013  Construction is complete! Structure is currently being used by applicant.  Bonus note:  Le Happy will now offer live music under the covered structure every Thursday afternoon!  [See completed space above]  Come hang out under the disco ball!<\/li><\/ul><ul><li>Sandlandia \u2013 Bid won by Neilson Construction of Fairview.\u00a0 Construction currently in progress.<\/li><\/ul><ul><li>Boring Brewing \u2013 Bid won by McCord Construction of Gresham.\u00a0 Construction currently in progress \u2013 see roof being constructed at their shop below.<\/li><\/ul><ul><li>Red Shed Public House \u2013 Bid won by Mtn View Contracting Company.\u00a0 Construction to start week of 7\/12.<\/li><\/ul><ul><li>No Place Saloon \u2013 Out to bid.<\/li><\/ul><ul><li>Tollgate Inn \u2013 Applicant decided that he was not happy with the results from Patio Cover People and wants to go in a different direction.\u00a0 Applicant forwarded additional contractor contact info he would like me to look into\u2026<\/li><\/ul><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"638\" src=\"http:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-1024x638.jpg\" alt=\"\" class=\"wp-image-1016\" srcset=\"https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-1024x638.jpg 1024w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-300x187.jpg 300w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-768x479.jpg 768w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-1536x957.jpg 1536w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-2048x1276.jpg 2048w, https:\/\/reports.cityofsandy.com\/planning\/files\/2021\/07\/BB-CS-July-481x300.jpg 481w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption>Roof for Boring Brewing covered structure being constructed off-site at McCord Construction<\/figcaption><\/figure>\n\n\n\n<p><strong><s><br><\/s><\/strong><strong>Economic Development items:<\/strong><\/p>\n\n\n\n<p><em><u><br>Econ Devl &#8211; Commercial Properties (vacancies, new businesses, etc.)<\/u><\/em>:<br><br><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Tenant Improvement project \u2013 Red Shed Public House:&nbsp; This TI grant project is to add a hood and fire suppression system to the kitchen at this restaurant.&nbsp; The restaurant currently does all of its cooking on outdoor grills, but the current owner does not see this as a sustainable practice going forward.&nbsp; Project estimated to be complete in August.<\/li><\/ul>\n\n\n\n<p><em><u>Econ Devl \u2013 Internal Projects<\/u><\/em>:<br><br><\/p>\n\n\n\n<p>Downtown maintenance:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>AF Downtown Maintenance:&nbsp; The second batch of small projects went to new Outdoor Programs Manager Max Krieger in June.&nbsp; Projects included multiple cleanups of landscaping strips on Proctor and Pioneer Boulevards in the couplet (Big Apple, Brady\u2019s Brats &amp; Burgers, small strips around the transit center), and some general weeding around Joe\u2019s Donuts.&nbsp; We have also secured a commitment from AntFarm Youth Services to dig out all landscaping strips adjacent to their Outdoor Building and replace with weed matting and bark dust before the end of the year.<\/li><li>Flower baskets:&nbsp; Watering staff has stabilized \u2013 baskets\/planters are being watered every evening and fertilized regularly.&nbsp; First application of insecticide for petunia worms has been applied.&nbsp; Baskets look fantastic.&nbsp; All is well here.<\/li><\/ul>\n\n\n\n<p><em><s><u><br><\/u><\/s><\/em><em><u>Econ Devl \u2013 Economic Development Committee<\/u><\/em>:<\/p>\n\n\n\n<p>The June meeting of the Economic Development Committee was held virtually on June 2<sup>nd<\/sup> at 6:30 PM.&nbsp; After completing a general check-in with committee members, we launched immediately into a presentation by Sandy business owner Joey Gambino regarding the zone change he recently completed for Rogue Fabrication, and how the City might look at making slight adjustments to its code to help ease the development path for light manufacturers like him.&nbsp;&nbsp; The staff liaison then provided a presentation about economic development strategic plans: what they are, why they are important, and a couple of examples of communities that have completed one recently (Beaverton, Ashland), before finishing the meeting with a current Covered Structures program status update.<\/p>\n\n\n\n<p>The next meeting is scheduled for Wednesday, August 4<sup>th<\/sup> at 6:30 PM.<\/p>\n\n\n\n<p><em><u>Econ Devl \u2013 Conferences\/training<\/u><\/em>:<\/p>\n\n\n\n<p>There were no conferences or training opportunities for Economic Development in the month of June.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2nd Quarter Report 2021 \u2013 available lots in subdivisions Attached is an&nbsp;updated&nbsp;platted&nbsp;and tentative&nbsp;platted&nbsp;lots&nbsp;list through June 30, 2021. &nbsp;We issued 16 single family homes between April and June. &nbsp;With substantial completion occurring at Shaylee Meadows the number of house permits issued &hellip; <a href=\"https:\/\/reports.cityofsandy.com\/planning\/2021\/07\/09\/development-services-monthly-report-june-2021\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1012","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/1012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/comments?post=1012"}],"version-history":[{"count":1,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/1012\/revisions"}],"predecessor-version":[{"id":1018,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/1012\/revisions\/1018"}],"wp:attachment":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/media?parent=1012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/categories?post=1012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/tags?post=1012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}