{"id":253,"date":"2014-03-06T00:34:20","date_gmt":"2014-03-06T00:34:20","guid":{"rendered":"http:\/\/reports.cityofsandy.com\/planning\/?p=253"},"modified":"2014-03-06T00:34:20","modified_gmt":"2014-03-06T00:34:20","slug":"january-2014-planning-and-building-report","status":"publish","type":"post","link":"https:\/\/reports.cityofsandy.com\/planning\/2014\/03\/06\/january-2014-planning-and-building-report\/","title":{"rendered":"January 2014 &#8211; Planning and Building Report"},"content":{"rendered":"<p><strong>1) APPLICATIONS SUBMITTED\/UNDER REVIEW &#8211; JANUARY 2014<\/strong><\/p>\n<p>a) File No. 14-002 DR &#8211; Design Review to construct tennis court dugouts at Sandy High School<\/p>\n<p>b)\u00a0File No. 14-003 DR &#8211; Design Review to construct batting cage at Sandy High School<\/p>\n<p><strong>2)\u00a0BUILDING DIVISION ACTIVITY &#8211; <\/strong>Home construction activity has continued at a fairly rapid pace to begin the new year.<\/p>\n<p>a)\u00a0Total value for the month was $1,803,395.<br \/>\nb) 9 permits for single family dwellings with a value of $1,769,325.<br \/>\nc) 1 permit for an addition to a single-family dwelling with a value of $15,000.<br \/>\nd) 0 duplexes.<br \/>\ne) 3 commercial permits with a value of $9,850.<br \/>\nf) \u00a04 other permits with a value of $9,220.<\/p>\n<p><strong>FROM TERRE GIFT, BUILDING OFFICIAL &#8211;<\/strong>\u00a0 January construction and remodel projects have picked up in pace and number due in part to the economy improving and the below normal rain fall.\u00a0 \u00a0This winter\u2019s temperatures have also been above average.\u00a0\u00a0 Hayden Homes has 6 new homes in various phases of construction, and 4 more plans in review.\u00a0 Stonecreek development currently has been 10 new homes under construction and received occupancy approval for 2 others in January. \u00a0During January, Bill Huffendick, and Nails Construction also received final occupancy on the homes they were building.\u00a0 Nails Construction and Taleisin Homes each started new house, which brings the number for Taleisin to 5 in progress.\u00a0 Jim Raze currently has 5 homes underway and one more ready to issue.<\/p>\n<p>Commercial Plan review was completed for Starbucks proposed renovation of the Jack In The Box restaurant.\u00a0\u00a0 Permits were issued and construction has begun at the building formally occupied by Sandy Glass, and also for Suburban Ford\u2019s Fa\u00e7ade. \u00a0\u00a0Lastly, Cedar Park Gardens Apartments has substantially completed their exterior repairs and improvements.<\/p>\n<p><strong>3) URBAN RENEWAL\u00a0<\/strong>&#8211; All facade enhancement projects for this year have been finished and we are now working on planning for next year&#8217;s projects. \u00a0The following three projects are in the works: Wheatland Building, Sah Building, and Clackamas County Bank.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1) APPLICATIONS SUBMITTED\/UNDER REVIEW &#8211; JANUARY 2014 a) File No. 14-002 DR &#8211; Design Review to construct tennis court dugouts at Sandy High School b)\u00a0File No. 14-003 DR &#8211; Design Review to construct batting cage at Sandy High School 2)\u00a0BUILDING &hellip; <a href=\"https:\/\/reports.cityofsandy.com\/planning\/2014\/03\/06\/january-2014-planning-and-building-report\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-253","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/comments?post=253"}],"version-history":[{"count":4,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/253\/revisions"}],"predecessor-version":[{"id":259,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/posts\/253\/revisions\/259"}],"wp:attachment":[{"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/media?parent=253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/categories?post=253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/planning\/wp-json\/wp\/v2\/tags?post=253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}