{"id":225,"date":"2015-04-10T19:37:11","date_gmt":"2015-04-10T19:37:11","guid":{"rendered":"http:\/\/reports.cityofsandy.com\/publicworks\/?p=225"},"modified":"2015-04-10T19:37:11","modified_gmt":"2015-04-10T19:37:11","slug":"monthly-report-public-works-department-march-2015","status":"publish","type":"post","link":"https:\/\/reports.cityofsandy.com\/publicworks\/2015\/04\/10\/monthly-report-public-works-department-march-2015\/","title":{"rendered":"Monthly Report Public Works Department &#8211; March 2015"},"content":{"rendered":"<p><strong>WATER<\/strong>\u00a0&#8211; A total of 27,169,000 gallons of water were delivered, 1,310,000\u00a0gallons from\u00a0Alder Creek treatment plant, 10,220,000\u00a0gallons from\u00a0Brownell Springs and 15,639,000\u00a0gallons purchased from City of Portland. 8.15\u00a0inches of rainfall were recorded at the treatment plant site during March. The one-year warranty inspection of the gas to liquid disinfectant project at the treatment plant and Brownell Springs was completed. A few items were noted and are being corrected.<\/p>\n<p><strong>WASTEWATER &#8211;\u00a0<\/strong>A total of 50,820,000 gallons of sewage were treated and discharged to Tickle Creek. Minimum flow was 1.02\u00a0MGD on the 4th. Maximum flow was 4.42\u00a0MGD on the 15th.\u00a0(rainfall was 2.1\u00a0inches on the 14th\u00a0and 0.4\u00a0inches on the 15th). A total of 6.2\u00a0inches\u00a0of rainfall was recorded during March.\u00a0<span style=\"color: #373737\">\u00a0BOD concentration was 6.6\u00a0mg\/l; BOD loading was 82\u00a0lbs.; permit allows 10\u00a0mg\/l and 125\u00a0lbs.; SS concentration was 4.3 mg\/l; SS loading was 59\u00a0lbs.; permit allows 10 mg\/l and 125 lbs. \u00a0We were in compliance with our discharge permit for the month of March. Due to the unusually warm and dry weather we had in March we sent\u00a0treated wastewater to the nursery for irrigation use between the\u00a05th and the 15th. No\u00a0sludge was processed, hauled or spread during the month. The pumps at Marcy St.; Northside, Southside, Southeast, Southwest and Meinig Ave. lift stations ran a total of 337\u00a0hours with no significant problems. \u00a0<\/span><\/p>\n<p><strong>STREETS<\/strong><em>\u00a0&#8211;\u00a0<\/em>The street sweeping contractor spent 48\u00a0hours sweeping streets and collected more than 15\u00a0tons (24 cu. yds.) of debris, covering 151\u00a0lane miles<em>. <\/em>Preliminary work began on installing the wayfinding signs.<\/p>\n<p style=\"font-weight: inherit\"><strong>PARKS \/ OTHER &#8211; <\/strong>Parks staff were busy with mowing between rain showers in the last half of the month.\u00a0Over Spring Break parks staff resumed opening the restrooms in Meinig Park between 8:00 and 5:00. \u00a0Parks staff pruned\u00a0street trees on Proctor Blvd.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WATER\u00a0&#8211; A total of 27,169,000 gallons of water were delivered, 1,310,000\u00a0gallons from\u00a0Alder Creek treatment plant, 10,220,000\u00a0gallons from\u00a0Brownell Springs and 15,639,000\u00a0gallons purchased from City of Portland. 8.15\u00a0inches of rainfall were recorded at the treatment plant site during March. The one-year warranty &hellip; <a href=\"https:\/\/reports.cityofsandy.com\/publicworks\/2015\/04\/10\/monthly-report-public-works-department-march-2015\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-225","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/comments?post=225"}],"version-history":[{"count":3,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/225\/revisions"}],"predecessor-version":[{"id":229,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/225\/revisions\/229"}],"wp:attachment":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/media?parent=225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/categories?post=225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/tags?post=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}