{"id":418,"date":"2018-05-22T00:45:06","date_gmt":"2018-05-22T00:45:06","guid":{"rendered":"http:\/\/reports.cityofsandy.com\/publicworks\/?p=418"},"modified":"2018-05-22T00:45:06","modified_gmt":"2018-05-22T00:45:06","slug":"monthly-report-april-2018-public-works-department","status":"publish","type":"post","link":"https:\/\/reports.cityofsandy.com\/publicworks\/2018\/05\/22\/monthly-report-april-2018-public-works-department\/","title":{"rendered":"Monthly Report April 2018 &#8211; Public Works Department"},"content":{"rendered":"<p><strong>WATER<\/strong>\u00a0\u2013 A total of 32,552,800 gallons of water were treated and delivered during the month. 8,332,000 gallons from\u00a0Alder Creek treatment plant, 9,500,000 gallons from\u00a0Brownell Springs and 14,720,000\u00a0gallons purchased from City of Portland. Maximum day\u00a0production\u00a0was 1.2 MG on April 3rd.\u00a0 7.47 inches of rainfall were recorded at the water treatment plant site during April.<\/p>\n<p><strong>WASTEWATER<\/strong><em><strong> \u2013\u00a0<\/strong><\/em>A total of 40,150,000 gallons of sewage were treated and discharged to Tickle Creek. Minimum flow was 0.75 MGD on the 25th. Maximum flow was 3.19 MGD on the 8th. BOD concentration was 9.0 mg\/l; BOD loading was 95 lbs; permit allows 10\u00a0mg\/l and 125\u00a0lbs.; SS concentration was 14.0\u00a0mg\/l; SS loading was 124 lbs.; permit allows 10 mg\/l and 125 lbs.<\/p>\n<p><strong>STREETS<\/strong>\u00a0<strong>&amp;\u00a0STORM<\/strong>\u00a0\u2013\u00a0 PW staff placed over 40 tons of asphalt repairing potholes, utility cuts, paver seams and drainage issues. We rented a grinder allowing us to remove high spots on several streets to improve drainage.<\/p>\n<p><a href=\"http:\/\/reports.cityofsandy.com\/publicworks\/files\/2018\/05\/20180418_120351-e1526949711687.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-419\" src=\"http:\/\/reports.cityofsandy.com\/publicworks\/files\/2018\/05\/20180418_120351-e1526949711687-768x1024.jpg\" alt=\"\" width=\"584\" height=\"779\" srcset=\"https:\/\/reports.cityofsandy.com\/publicworks\/files\/2018\/05\/20180418_120351-e1526949711687-768x1024.jpg 768w, https:\/\/reports.cityofsandy.com\/publicworks\/files\/2018\/05\/20180418_120351-e1526949711687-225x300.jpg 225w\" sizes=\"auto, (max-width: 584px) 100vw, 584px\" \/><\/a><\/p>\n<p><strong>PARKS, BUILDINGS AND GROUNDS<\/strong> &#8211; PB&amp;G staff focused on mowing and weeding in City parks and at City buildings.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WATER\u00a0\u2013 A total of 32,552,800 gallons of water were treated and delivered during the month. 8,332,000 gallons from\u00a0Alder Creek treatment plant, 9,500,000 gallons from\u00a0Brownell Springs and 14,720,000\u00a0gallons purchased from City of Portland. Maximum day\u00a0production\u00a0was 1.2 MG on April 3rd.\u00a0 7.47 &hellip; <a href=\"https:\/\/reports.cityofsandy.com\/publicworks\/2018\/05\/22\/monthly-report-april-2018-public-works-department\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-418","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/comments?post=418"}],"version-history":[{"count":1,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/418\/revisions"}],"predecessor-version":[{"id":421,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/418\/revisions\/421"}],"wp:attachment":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/media?parent=418"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/categories?post=418"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/tags?post=418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}