{"id":694,"date":"2024-06-20T18:17:37","date_gmt":"2024-06-20T18:17:37","guid":{"rendered":"https:\/\/reports.cityofsandy.com\/publicworks\/?p=694"},"modified":"2024-06-25T21:57:47","modified_gmt":"2024-06-25T21:57:47","slug":"public-works-monthly-report-2","status":"publish","type":"post","link":"https:\/\/reports.cityofsandy.com\/publicworks\/2024\/06\/20\/public-works-monthly-report-2\/","title":{"rendered":"PUBLIC WORKS \u2013 May Monthly Report"},"content":{"rendered":"\n<p><strong><mark style=\"background-color:#782bde\" class=\"has-inline-color has-white-color\">MAY 2024<\/mark><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\"><strong><mark style=\"background-color:#4be5e0\" class=\"has-inline-color has-black-color\"><em>WATER<\/em>:<\/mark><br><\/strong><br><p class=\"MsoListParagraphCxSpFirst\" style=\"margin-bottom:0in;text-indent:-.25in;line-height:normal;background:white;vertical-align:baseline\"><\/p><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><em>Alder Creek<\/em><\/strong> had a Peak Day production of 1.029 MG on May 14, 2024<br><\/li>\n\n\n\n<li><strong><em>Alder Creek<\/em><\/strong> water plant production net of backwash water used was 15.201 MG<br><\/li>\n\n\n\n<li><strong><em>Brownell Springs<\/em><\/strong> production was a total of 10.6 MG and Peak Day production was on May 29<sup>th<\/sup> &nbsp;with a total of 408,795 gallons.<\/li>\n\n\n\n<li><strong><em>Portland Water Bureau<\/em><\/strong> source production was a total of 6.39 MG with a Peak Day production of 208,451 gallons on May 31<sup>st<\/sup><\/li>\n\n\n\n<li>We recorded a total of 7.76 inches of rainfall at the water plant with peak rainfall on May 21<sup>st<\/sup> with a total of 1.27 inches.<\/li>\n<\/ul>\n\n\n\n<p><mark class=\"has-inline-color has-blue-color\"><strong><u>EQUIPMENT ISSUES:<\/u><\/strong><\/mark><br><br>Wall-Pak lights installed on outside of WTP building for night-time safety<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\"><em><mark style=\"background-color:#aae467\" class=\"has-inline-color\">WASTEWATER:<\/mark><\/em><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Total <strong>INF Flow<\/strong> was 42.83 MG and <strong>EFF Flow<\/strong> was 32.12<br><\/li>\n\n\n\n<li><strong>Power Consumption <\/strong>(kWh): 130, 400 kWh<br><\/li>\n\n\n\n<li>On May 5th the <strong>Peak day flow <\/strong>was 3.65 MGD<br>0.38 inches of <em>rainfall<\/em> was <em>recorded<\/em> the day before and 1.33 inches the day of.A<br><\/li>\n\n\n\n<li><strong>Monthly rainfall <\/strong>recorded at the plant was 4.49 inches with a peak of 1.33 inches on May 5<sup>th<\/sup>.<br><\/li>\n\n\n\n<li>0.73MG of sludge was dewatered, processed and landfilled during January.<br><\/li>\n\n\n\n<li><strong>Monthly Average Effluen<\/strong>t- BOD: 7.1 &amp; TSS: 9.6<\/li>\n<\/ul>\n\n\n\n<p><strong><u><mark class=\"has-inline-color has-blue-color\">EQUIPMENT ISSUES:<\/mark><\/u><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>5\/1 \u2013 Switch made to summer discharge at Iseli&#8217;s Nursery<\/li>\n\n\n\n<li>5\/5 \u2013 Recycle water pumps failed due to suspected airlock, temp pump hooked up by city crew for redundancy.<\/li>\n\n\n\n<li>5\/6 \u2013 Process water pump #1 pulled and replaced.<\/li>\n\n\n\n<li>5\/15 -PSI Setpoint changes to blower controls to achieve reduction in aeration basin DO and improve settleability.<\/li>\n\n\n\n<li>5\/21 \u2013 Clarifier 1 drive motor replaced<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>MAY 2024 WATER: EQUIPMENT ISSUES: Wall-Pak lights installed on outside of WTP building for night-time safety WASTEWATER: EQUIPMENT ISSUES:<\/p>\n","protected":false},"author":32,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-694","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/694","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/comments?post=694"}],"version-history":[{"count":3,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/694\/revisions"}],"predecessor-version":[{"id":698,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/posts\/694\/revisions\/698"}],"wp:attachment":[{"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/media?parent=694"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/categories?post=694"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reports.cityofsandy.com\/publicworks\/wp-json\/wp\/v2\/tags?post=694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}