PUBLIC WORKS MONTHLY REPORT – July 2024

WATER:

·    Alder Creek had a Peak Day production of 1.243 MG on July 7, 2024

 ·    Alder Creek water plant production net of backwash water used was 29.26

 ·    Brownell Springs production was a total of 11.97 MG and Peak Day production was on July 10th with a total of 401,985 gallons.

 ·    Portland Water Bureau source production was a total of 8.78 MG’s with a Peak Day production of 518,987 gallons on July 2nd.

 ·    We recorded a total of .33 inches of rainfall at the water plant with peak rainfall on July 29th with a total of .28 inches.

EQUIPMENT ISSUES:
7/13/24 – Sump pump in manhole failed, temp pump installed in manhole.

WASTEWATER:

  • On July 2nd the Peak day flow was 1.01 MG.

1.27 inches of rainfall was recorded the day of and 0.26 inches the day after.

  • Monthly rainfall recorded at the plant was 0.23 inches with a peak of 0.20 inches on July 30th.
  • 0.46 gallons of sludge were dewatered, processed and landfilled during June.
  • Monthly Average Effluent- BOD: 2,223 lbs/day & TSS: 1,615 lbs/day

EQUIPMENT ISSUES:
7/18/24 – Tertiary UV Filter 3 backwash pump replaced