Development Services – Monthly Report – October 2022

3rd Quarter Report 2022 – Vacant Platted & Tentative Platted Lots:

Platted Lots Report – 3rd quarter 2022

Attached is an updated platted and tentative platted lots list through September 30, 2022.  We issued 19 single family homes between July and September in Shaylee Meadows and Jewelberry Meadows.  The Bornstedt Views tentative plat was approved for an additional 43 lots added to the tentative platted lots list. 

We have issued four single family home permits to Lennar in Shaylee Meadows since September 30, 2022, but those are not deducted from the spreadsheet yet.  Staff is currently reviewing the remaining fifteen single family homes in Shaylee Meadows and several other homes in other subdivisions.

You will receive the next update in January 2023.

Planning Department items:

Self-Service Storage Code Modifications (2022-043 DCA):  Modifications to the SMC removing self-storage businesses as a permitted use in the C-1 & C-2 zones and allowing only as a conditional use in I-1 will be reviewed and submitted for approval by the Planning Commission at their regular meeting on November 28th.  A Measure 56 notice for this issue was distributed on November 1st.

St Michael’s Church tree removal (22-034 TREE):  This retroactive tree removal request for the local Catholic Church on Langensand Road was deemed incomplete back in September.  Staff is currently waiting for the applicant to provide additional materials needed for review.

Hood Chalet hazard tree removal (22-036 TREE):  This tree removal request for the Hood Chalet mobile home park was deemed incomplete back in September.  Staff is still waiting for the applicant to provide additional materials needed for review.

Cascade Creek Apartments (22-039 DR/MP/TREE):  This application for an 80 unit mixed-use multi-family development with 10 office spaces north of Bornstedt Park has been deemed incomplete.  Staff has requested additional materials from the applicant needed for review.

Jewelberry Meadows Lot 14 15226 Birch (ADJ/ADU):  This application for an ADU and Type II adjustment to the rear yard setback is now complete and currently being reviewed by staff.

362nd/Bell Street Extension – Bell Street Arch

362nd Ave and Bell Street Extension (22-003 FSH/MP):  Grading of both roads is still 98% complete.  The permit needed from US Army Corps of Engineers to tie together the culverts has been closed — Konell will be working on the stormwater infrastructure in this area for several more months.  Konell poured the footings and have installed the Bell Street arch and has partially backfilled the arch.  They have formed and poured the headwalls on each side of the arch and have also started excavating for the retaining walls on either side of Bell Street.  Stormwater pond on the Skipper property is now completed.  Stormwater detention pipe will be installed on Bell Street east of the arch in November.

Moratorium Communication Update:  The Development Services Department continues to have conversations with develo0pers and citizens regarding the moratorium.  Planning staff worked with city administration to create an ERU resources page, which you may visit here.

The Riffles Food Cart Pod (22-012 DR/VAR/ADJ):  The final order for this food cart facility at 37115 Highway 26 (next to the MHAC & the dialysis center) was issued by staff on August 2nd.  Applicant is currently working on making necessary adjustments to the items identified under findings and conditions, and it is likely that grading and construction work will start before the end of 2022.

City of Sandy Comprehensive Plan Update, Economic Opportunities Analysis (EOA):  Our contractor for the comprehensive plan update, 3J Consulting, will be presenting to the City Council and Planning Commission joint session on November 7th, at which they will describe the public outreach actions taken and the final development of vision statements to this point in the project.