WATER:
- Alder Creek had a Peak Day production of 0.901 MG on June 30th.
- Alder Creek water plant production net of backwash water used was 11.66 MG.
- Brownell Springs production was a total of 7.03 MG and Peak Day production was on June 7th with a total of 435,615 gallons.
- Portland Water Bureau source production was a total of 13,757,517 gallons with a Peak Day production of 614,468 on June 17th.
- We recorded a total of 9.28 inches of rainfall at the water plant with peak rainfall on June 10th with a total of 2.51 inches.
- Equipment Issues: None noted.
WASTEWATER
- On June 10th the Peak day flow was 3.74 MG and there was 1.35 inches of rainfall. The day before on March 9th, no rainfall was recorded.
- A total of 42.52 MG of sewage was treated in the month of June.
- Monthly rainfall recorded at the plant was 6.03 inches with a peak of 2.00 inches on June 11th.
- 1,170,280 gallons of sludge were dewatered, processed and landfilled during June.
- Monthly Average Effluent BOD and the June monthly average for TSS was reported as N/A (recycled).
- Equipment Issues:
June 12th – Overflow led to clogged process pumps. Replaced both.
June 22nd – Disk filter 1 drive motor failed. Replacement options are being investigated - Permit Exceedances or Excursions:
June 10th – Large rain event led to emergency discharge into Tickle Creek
STREETS:
The City’s street sweeping contractor removed 16 cubic yards of debris.