WATER:
- Alder Creek had a Peak Day production of 1.365 MG on August 26th.
- Alder Creek water plant production net of backwash water used was 29.440 MG.
- Brownell Springs production was a total of 9.4 MG and Peak Day production was on August 9th with a total of 426,180 gallons.
- Portland Water Bureau source production was a total of 15,403,775 gallons with a Peak Day production of 501,009 on August 11th.
- We recorded a total of .13 inches of rainfall at the water plant with peak rainfall on August 9th with a total of .05 inches.
- EQUIPMENT ISSUES: N/A
WASTEWATER
- On August 18th the Peak day flow was .79 MG and there was 0 .00 inches of rainfall.
- A total of 20.97 MG of sewage was treated in the month of August.
- Monthly rainfall recorded at the plant was 0.00 inches in August.
- 565,060 gallons of sludge were dewatered, processed and landfilled during August.
- Monthly Average Effluent BOD & TSS (concentration) was RECYCLED in the month of August.
- EQUIPMENT ISSUES:
* August 2nd – Replace Bearing Draft Shaft Assembly (Belt Press).
* August 3rd – Motor on Tertiary 1 replaced.
* August 6th – New HACH EFF Sampler installed.
* August 11th – Tertiary 1 carpet replaced.
* August 12th – Mechanical Seal Failure (Pista Grit)
– Headworks not connecting to generator w/ power outage
* August 13th – Blower 1 & 2 (Aeration) Oil leaking/filling sight glass past fill line and
dropping oi (Tech called) Blower 3 – continued power trip
* August 19th – Agri-plas hauled 50 empty drums offsite
– New Mechanical Seal installed on Pista Grit
* August 22nd – BFP feed pipe failure 08
* August 23rd – BFP back online
* August 26th – EFF Ultrasonic Level Sensor Failure - PERMIT EXCEEDANCES OR EXCURSIONS: N/A
STREETS: The City’s street sweeping contractor removed 18 cubic yards of debris in August.